User Tools

Site Tools


academic_database:projectphase1

PHASE 1: INTERMEDIATE SUBMISSION CHECKLIST/SIGNOFF SHEET

GROUP #: 16 GROUP NAME: FIXME


Intermediate Deliverables:

  • Requirements description
  • ER diagram with min/max specifications

Intermediate Assessment:

  • Group Status Report

We have each reviewed the contents of this deliverable.

                        Printed Name               Signature
Phase Leader            Valdrin Asllani         ___________________
Phase Recorder          Jeremy Booker           ___________________
Phase Checker           Jordan Born             ___________________
Technical Advisor 1     Bing Hao                ___________________
Technical Advisor 2     Pedro Perez             ___________________

(Above block needs further work)FIXME


1. Introduction


2. Requirements and Description of the Enterprise


3. Conceptual Design ER Diagram


GROUP STATUS REPORT

academic_database/projectphase1.txt · Last modified: 2023/02/11 17:30 by 127.0.0.1

Except where otherwise noted, content on this wiki is licensed under the following license: CC Attribution-Noncommercial-Share Alike 4.0 International
CC Attribution-Noncommercial-Share Alike 4.0 International Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki